检查概况
2022年2月1日至3月1日,东京备忘录共开展PSC检查1807艘次,滞留船舶37艘次,其中澳大利亚滞留船舶13艘次,俄罗斯12艘次,中国6艘次,详细情况如下表。
滞留案例举例
案例一
缺陷描述: 06104 Lashing material
Significant number of base twistlocks, in excess of 35% found defective bays 1,3 13 and 15. Examination of twistlock bins found approximately 25% defective. None of the defective twistlocks found had been separated and prohibited from use.
缺陷依据:SOLAS ch. VI, S74/CVI/5.4
案例二
缺陷描述:07105 Fire doors/openings in fire-resisting divisions
Lot of accomodation interior stairways fire protection self-closing doors found out-of-order
缺陷依据:SOLAS ch. II-2, S74/CII-2/R9
案例三
缺陷描述:11113 Launching arrangements for rescue boats
Davit of Rescue Boat - no pressure in hydr. system. Davit is not ready for emergency use.
缺陷依据:LSA Code, S74-2/CIII/R15;
案例四
缺陷描述:18410 Gas instruments
Portable gas detector - out of order
缺陷依据: MLC 2006 Title 4, MLC/T4/R4.3;
案例五
缺陷描述:07115 Fire-dampers
Engine room and funnel flaps ( top side) were found not able to close fully
缺陷依据:SOLAS ch. II-2, S74-9/CII-2/R41-2.6.3;
案例六
缺陷描述:07105 Fire doors/openings in fire-resisting divisions
Fire door for emergency exit from engine room - found out of order
缺陷依据:SOLAS ch. II-2, S74-24/CII-2/R9.2.2.2.2.2, R9.4.1.1.2; S74-24/CII-2/R9.4.2;
案例七
缺陷描述:10112 Electronic charts
ECDIS and back up arrangement both out of order
缺陷依据:SOLAS ch. V, S74-24/CV/R27
案例八
缺陷描述: 14501 Garbage
Garbage stored in forward store, not in compliance with garbage management plan.
案例九
缺陷描述:18321 Heating, air conditioning and ventilation
The vessel is not adapted for operation in cold climate conditions in winter season-air conditioner heater not arranged on board,living conditions is not favourable for ship's crew.
缺陷依据:MLC 2006 Title 3, MLC/T3/R3.1;
11-26 来源:验船师袁晓东 船之友
12-31 来源:阳光安检
10-20 来源: 蓝盾安检创新工作室
02-23 来源:洋山港海事局
01-30 来源:信德海事网
01-22 来源:信德海事网
03-28 来源:张家港海事局船舶交通管理中心
08-01 来源:蓝盾安检
01-06 来源:中山海事
09-24 来源: 蓝盾安检创新工作室